Precision, made repeatable.

Process standardization and throughput work for small and mid-size manufacturers in Ottawa and Eastern Ontario. We find where the variation enters and build the standards that take it out.

Illustration: measurements of a bore diameter with a tolerance of plus or minus 0.020 mm. With each operator using their own method, readings spread wide, the process capability index is 0.37 and about 124 parts in 1,000 are out of tolerance. After the process is measured and standardized, the spread narrows to 0.024 mm and the capability index reaches 1.67.

Most throughput problems are not speed problems. They are stability problems, and stability is something you can measure.

  • Output depends on who is on shift

    Setups vary by operator, methods drift, and results vary with them.

  • Critical steps live in one person's head

    When that person is away or retires, first-pass yield drops and nobody can say exactly why.

  • Nobody is sure where the constraint is

    Capacity feels tight, but the real bottleneck has never been measured, or it keeps moving.

How the work runs

Every engagement has a written scope, a fixed end and a result you can act on.

  1. Intro call

    15 to 30 minutes on where the time is going and whether we can help.

  2. Fixed scope

    A short written scope with deliverables, a price and an end date.

  3. Measure and standardize

    We watch how the work actually runs, put numbers on it, and build the standards.

  4. Decision-ready result

    What to stabilize first, what to improve next, and what to leave alone.

What you get

The proof is in the paperwork.

Every engagement ends in documents your team can pick up on Monday morning. These are samples, made for an imaginary bracket, so you can judge the standard before you call.

Setup sheet

BRK-1042 · Op 20

Part
Bracket, rev C
Machine
VMC 3
Fixture
F-1042-20
Program
O1042.20 r4
12 Ø12 H7
  1. Seat on both pins before clamping. Off one pin, the bore moves 0.1 mm and fails on the CMM.
  2. Clamp 1, then 2, at 25 N·m. Clamping 2 first lifts the far end.
First-part checkGaugeIf off
Ø12 H7 boreBore gaugeT14 wear +0.005

AS9102 Form 3

Characteristic accountability

1 2 3 4 5
#RequirementResultTool
1170.0 ±0.2170.06CMM
2Ø12.000 +0.018/012.009Bore gauge
3Position Ø0.10 A B0.046CMM
4Ra 1.60.9Profilometer
5Note 4, break edgesConformsVisual

5 of 5 characteristics conformAccept

Capability study

Bore Ø25.000 ±0.020

LSLUSL
Cpk1.58
Ppk1.41
Readings50

Capable, running 0.0035 mm high. Centring on nominal lifts Cpk to 1.91 with no other change. Gauge R&R 8% of tolerance, so the number can be trusted.

Next review after 100 partsCapable

Sample documents for an imaginary part. Real deliverables follow your drawings, your forms and your customer's requirements.

Engagements

Most shops start with process standardization. The others depend on what it finds.

Process standardization and throughput stabilization Start here

Turn unstable, undocumented shop-floor execution into repeatable standards and a clear improvement roadmap.

  • Targeted SOPs, setup sheets and work instructions
  • Stability and throughput assessment
  • Prioritized improvement roadmap
Manufacturing readiness

Close the gap between design intent and production reality before a launch, a scale-up or a transfer.

  • Manufacturing readiness assessment
  • Process definition and early work instructions
  • Risk register with mitigation actions
Throughput and bottleneck analysis

Find the real constraint and what drives its variation before deciding on overtime, outsourcing or capital.

  • Constraint and bottleneck analysis
  • Cycle time and variability assessment
  • Decision summary for leadership
Knowledge capture

Get critical process knowledge out of people's heads and into standards that match how the work is really done.

  • SOPs and work instructions for critical processes
  • Standardization plan aligned to actual execution
  • Document structure and control guidance
Automation and capital decisions

Check that a process is stable enough to automate before the money is spent.

  • Automation readiness assessment
  • Process stability gap analysis
  • What to stabilize before investing

Fixed-price packages

Some problems don't need an engagement. These have a fixed scope and most can be done from what you send us.

PackageYou sendYou get
Setup sheets and work instructions A phone video of the setup and any notes you have A controlled instruction for one critical operation, with the steps that cause scrap called out
First article inspection package The drawing, customer requirements and your measurements A ballooned drawing and an AS9102-style report with characteristic, material and process accountability
Capability study Measurement data for a feature or process Cp and Cpk with a plain-language verdict and what to do about it
Drawing and tolerance review Part drawings A marked-up review of GD&T errors, ambiguity and tolerances that drive cost
CAD from an existing part A sample part or its measurements A 3D model and a toleranced drawing
TitleFixed-price packages
PricingQuoted before work starts
DeliveryRemote
Sheet1 of 1

Who does the work

AC is led by a Certified Engineering Technologist whose career has run from the inspection bench to launching new products into production.

More about how we work

Credential
Certified Engineering Technologist (CET)
Education
Degree in manufacturing engineering technology
Experience
Over five years in precision manufacturing
Process work
CNC process development and new product industrialization
Quality
ISO 9001 and AS9100 systems, first article inspection, capability studies
Measurement
GD&T and CMM metrology
CAD and CAM
Creo, SolidWorks and Mastercam

A good fit if you are

  • Dealing with inconsistent execution and output you can't predict
  • Trying to reduce dependence on a few key people
  • Preparing to scale, transfer or automate a process that isn't defined yet

Probably not a fit if you want

  • Overflow drafting or open-ended hourly support
  • Training that doesn't change how the work is done
  • A project with no defined outcome

Let's measure what's really happening.

Send a short note about the problem. We'll reply with whether we can help, and if we can't, who might.

  1. Intro call15 to 30 minutes on the real constraint
  2. Written scopeDeliverables, a fixed price and an end date
  3. The workOn your floor, finished when the scope says